PROJECTS

dee why.jpg

8 Oaks Avenue ,Dee Why NSW

​

Scope of Work:
Our team undertook an ambitious project located in the heart of Dee Why, NSW. This initiative involved the excavation of four levels of dirt, equivalent to approximately 20,000 cubic meters. Beyond the immense scale of the excavation, the project's complexities were numerous and demanded our technical expertise.

Key Aspects:

  • Unprecedented Depth: This project takes pride in being the deepest basement excavation in the Northern Beaches area.

  • IoT Monitoring: In our commitment to safety and precision, we installed state-of-the-art IoT devices to monitor the inclination of the retaining walls. This allowed for real-time insights and ensured structural stability throughout the excavation process.

  • Water Table Management: Due to the depth of the excavation, the challenge of managing the water table was paramount. Our team effectively leveraged advanced techniques and technology to keep the water table levels in check, ensuring a smooth excavation process.

  • Dewatering Wells: To further aid in the management of water during excavation, we installed dewatering wells reaching depths of 20 meters. This not only ensured a dry work environment but also maintained the structural integrity of the surrounding areas.

  • Water and Dirt Separation: Our sophisticated systems ensured the efficient separation of water from excavated dirt. With this setup, we were able to safely pump out water without disrupting the project's timeline.

Financial Overview

  • Contract Value: The project, given its intricate requirements and unprecedented scale for the region, was valued at approximately $3.5 million.

Conclusion:

The Dee Why project stands as a testament to Dynamic Dwellings Earthworx's commitment to pushing boundaries, employing technological advancements, and delivering unparalleled expertise. By achieving this engineering feat, we've not only set new benchmarks in excavation but have also demonstrated our capability to handle large-scale, complex projects with precision and efficiency.

​

28 Womerung Avenue, Castle Hill NSW

Scope of Work:
In the serene suburbs of Castle Hill, NSW, Dynamic Dwellings Earthworx embarked on a technically demanding piling project. With a varying depth range from 8 to 15 meters, the project's main challenge lay in accommodating the site's natural slope and softer ground composition.

Key Aspects:

  • Piling Precision: We successfully installed piles all around the job site, ensuring they met the required depth and strength specifications. This foundation work acts as the bedrock upon which the rest of the construction venture stands.

  • Managing Natural Challenges: The terrain's innate slope and soft ground composition posed significant challenges. Our expert team, equipped with specialized tools, ensured that these geographical hurdles were proficiently handled without compromising the project's integrity.

  • Inclination Monitoring: To guarantee the safety and stability of our piling work, especially given the soft ground, we integrated advanced inclination meters. These real-time monitoring tools ensured the vertical accuracy of our piles.

  • Dirt Excavation: In the process, we efficiently removed about 1,000 cubic meters of dirt, ensuring a smooth site for the following construction phases.

  • IoT Water Table Monitoring: Recognizing the importance of maintaining the water table, especially in soft terrains, we employed our proprietary IoT water table sensors. These devices provided crucial data that enabled us to swiftly respond to any water-related challenges, preserving the site's structural health.

Financial Overview:

  • Contract Value: Reflecting the detailed and meticulous nature of the project, the contract was valued at approximately $700k.

Conclusion:

Our venture in Castle Hill reiterates Dynamic Dwellings Earthworx's dedication to embracing challenges head-on and utilizing technology to enhance traditional construction methodologies. Every project, big or small, is a showcase of our commitment to precision, innovation, and the values we uphold.